SANITATION & DRAINAGE Home

 

SANITATION FACTS:

  • PUBLIC PRIVATE PARTICIPATION IN GARBAGE COLLECTION

    • 50% COLLECTION IS UNDER PPP THROUGH

    • 103 RESIDENT WELFARE ASSOCIATIONS(RWA) : Rs. 1.3 Cr/yr.

    • 50% COLLECTION UNDER MCV COSTS: Rs.8 Cr/Yr.

    • DOOR TO DOOR COLLECTION THROUGH 200 RWAs: 25 Lakhs/yr.

  • OUTSOURCING GARBAGE TRANSPORT

    • COST ON MCV TRANSPORT: Rs.2.8Cr/Yr or Rs.3500/MT

    • COST ON OUTSOURCED TRANSPORT: Rs.3.5Cr/Yr OR Rs.2600/MT.

SANITATION INITIATIVES:

  • OUTSOURCING ARTERIAL ROAD SANITATION:

    • 324 KM, 650 WORKERS, 15 AGENCIES, Rs1.5 Cr/Yr.

  • WASTE TO ENERGY PELLETISATION PLANT(6.6 MW, 50CR) UNDER PPP

  • 2000 OPEN COLLECTION POINTS REPLACED WITH 525 CLOSED BINS

  • WORK ON SANITARY LAND FILL AT 100 Ac, 25 Km DISTANT DUMPING YARD INITIATED.

  • MEASURES TO CONTROL OPEN DEFEACATION- NEW TOILETS, REPAIRS TO OLD TOILETS(134), SQUADS, SPARC

  • SURFACE DRAINAGE

    • KM OF MAJOR DRAINS/GEDDAS- PLAN FOR LINING

    • STORM WATER DRAINAGE

    • MLD OF DRAINAGE , MCV SPENDS CR

  • UNDER GROUND DRAINAGE:

    • CURRENT COVERAGE/COST

    • POTENTIAL/DEFICIT

    • CURRENT PROJECT/COST

    • DRAINAGE TREATMENT

    • UGD CONNECTIONS